Work with tasks

Use a project's task board to open tasks, assign them, set dates, tick off subtasks, move cards along and switch to List and Timeline views.

0:00 / 0:00

Every project has its own task board. It shows what is to do, what is in progress and what is done, and you can look at the same tasks as a list or a timeline.

Open the project's board

Open the project, and go to Tasks. Each column is a status. A card shows the task's priority, and how many of its subtasks are done.

A project's Tasks tab showing a board with columns for each status and task cards in To do.
Each column is a status, and each card is a task.

Open a task, assign it and set dates

Click a card to open the task. Assign it to someone, and give it a start date and a due date. A task with a due date also shows on the workspace Calendar.

The open task panel with the assignee, start date and due date filled in, and its list of subtasks below.
Assignee, dates and subtasks in the task panel.

Tick off subtasks

As the work gets done, tick off its subtasks. The card on the board shows how many are done.

Move a task along

To move a task along, drag its card into the next column. Its status changes with it.

The board with the task card now in the In progress column.
The card now sits in In progress.

Mark a task as blocked

When a task cannot start until another one is done, open it and use Blocked by task to pick the task it waits for. The task shows as Blocked, and you can mark the blocker as no longer blocking once the other task is finished.

Switch to List and Timeline

List shows the same tasks as rows, which is quicker to scan. Timeline lays out every task that has dates. Tasks without dates wait underneath until you give them some.

The List view of the project's tasks, one row each with status, priority, assignee and due date.
The List view: the same tasks as rows.

Change several tasks at once

In the List, tick the rows you want, or Select all. A bar shows how many are selected, with Change Status, Assign and Delete. Tasks that cannot take the change are left alone, and Rokn lists which ones were not changed.

Good to know

  • Board, List and Timeline are three views of the same tasks.

Next step: track the time you spend on them.